On April 30, the EPC general contracting bidding notice for Haili 240MW photovoltaic power station in Qiaojia County, Zhaotong City, Yunnan Province was announced. The bidding notice showed that the total capacity of the planned installation machine was 240MW. The scope of this tender EPC contracting mission includes other tasks except those clearly responsible by the tenderer, including but not limited to: exploration design of the station, procurement of equipment data (except for photovoltaic components and inverters being purchased by the contractor, other supplements. However, Sugar After baby, she looked down at the audience and saw that several equipment were purchased by the bidder), supplied and stored, and all construction installation projects, project management, commissioning, project testing, project testing, project completion and acceptance, training, transfer of production, functional quality assurance, project quality warranty, and engineering quality warranty date.

The original text is as follows:

The EPC general contracting bid notice of Haili 240MW photovoltaic power station in Qiaojia County, Zhaotong City, Yunnan Province is beautiful and singing well? Beautiful…singing…sweet? The sound is sweet, and the announcement is

(Tender number: TGT-XNYGF-JA202102D)

Project location: Yunnan Province

1. Tender termsSugar babyfile

This general contracting project of Haili 240MW photovoltaic power station in Qiaojia County, Zhaotong City, Yunnan Province has been approved by the project review/approval/preparation agency. The project funds are other funds/, and the bidder is Sanxia Group Yunnan Dynamic Investment Co., Ltd. This project has bidding conditions, and the current bidding method is public bidding.

2. Project overview and bidding scope

Scale: /;

Scope: This bid is divided into 1 bidding section, and this bid is among the following:

(001) EPC contract for the 240MW photovoltaic power station in Haili, Qiaojia County, Zhaotong City, Yunnan Province.

3. Request for the qualification of the bidder

(001 Qiaojia County, Zhaotong City, Yunnan ProvincePlease request the bidder qualifications of Haili 240MW photovoltaic power station EPC general contracting: Please refer to the bidding notice “7. Others” for details;

This project allows joint bidding.

IV. Acquisition of bidding documents

Earning time: From 08:30 on May 1, 2021 to 17:30 on May 6, 2021;

Earning method: For details, please visit this bid notice “7. Others”.

5. Deadline for delivery of bid documents: 10:00 on May 21, 2021;

Transfer method: For details, have you returned to this recruitment? “The tag notice is reported to “7. Others”.

6. Opening time and location

Opening time: 10:00 on May 21, 2021;

Opening location: Third Island Grand Building, No. 368, Tiantai Road, High-tech Zone, Chengdu Association, Sichuan Province.

7. Others

1. Bidding conditions

This bidding project YunnanManila escort The general contractor of Haili 240MW photovoltaic power station in Qiaojia County, Zhaotong City, Province has been approved for construction. The bidder is the Yunnan Power Investment Co., Ltd. of Sanyi Group, and the bidding representative agency is the Sanyi International bidding unlimited company. The construction funds come from the bidder’s own funds and self-financing funds. The project has already met the bid conditions and public bids are now being made for the project.

2. Project Overview and Tendering Scope

2.1 Project Overview

Qiaojia County Haili Photovoltaic Station is located on the north, east and west hillsides of Daguandong Village, Laodian Town, Qiaojia County, Zhaotong City, Yunnan Province. It uses pasture, cultivated land and unapplied land to build photovoltaic power generation projects. The project has 5,232 planned land and the total capacity of the planned installation machine is 240MW.

2.2 Tender Scope

(1) The scope of this Tender EPC general contracting task includes other tasks except those clearly responsible by the bidder, including but not limited to: exploration design of the power station, procurement of equipment data (except for photovoltaic components and inverters being distributed by Except for the person responsible for the procurement, other equipment is responsible for the procurement, supply and storage of the bidder. All construction and installation projects, project management, adjustment, project trial operation, bidding, project completion acceptance, training, transfer of production, functional quality assurance, project quality warranty, and service on the date of construction quality warranty.

Pinay escort

Important mission content includes but is not limited to:

Sugar daddy

1) Photovoltaic power generation Escort manila venue area, 220kV pressure upgrade station, entry and on-site routes, power supply for backup, energy storage facilities, unfamiliar water use, etc. About the exploration and design of this project Escort Manila, complete picture book cleaning, on-site technical services and other tasks, including but not limited to: preliminary design, construction drawing design and completion drawing editing, shall be reviewed by the bidder organization design, and the relevant evaluation prices shall be borne by the bidder.

2) The equipment purchased by this project includes but not limited to: brackets, box changes, cables, main changes, energy storage For all equipment and supporting equipment such as preparation, high-pressure pressure opening cabinets, power supply devices, power supply, computer monitoring, etc., as well as the above-mentioned equipment’s pickup, cargo unloading, storage, product protection, transfer, installation, wiring, test, and debugging, equipment purchased by the bidder must meet the contract quality request and the Internet and Internet request.

3) Data procurement, production and installation include but are not limited to optical fibers, cable slot boxes, grounding flat steel (copper wires, grounding electrodes, etc.), labels, cable mount plates, factory area columns and cable tags (suitable for the request of the bidder) and other supporting equipment facilities and related data, and meet the relevant standards requests of the Sanqi Group.

4) Civil construction tasks of this project include But it is not limited to: new construction and renovation of all entry and on-site routes, photovoltaic component bracket foundation, box foundation, energy storage equipment foundation, pressure lifting station department (including building buildings, various equipment foundations, etc.), 35kV integrated circuits in the field, grounding, intercepting and drainage, maintenance and other related civil construction tasks, as well as all requirements for supporting civil construction tasks.

EscortThe water, electricity and temporary facilities used during the construction period shall be solved by the bidder. All the water-interception and drainage facilities within the scope of the photovoltaic power station shall be responsible for.

5) Responsible for completing the project environmental protection project and the implementation of soil and water (slope protection, slope protection, water-interception and drainageSugar Baby vegetation recovery and area greening, etc.), water conservation and environmental protection monitoring, safety facilities, professional disease prevention and control facilities, and purification prevention and control facilities. The above tasks must meet the relevant requests and experience collection of relevant responsibilities and energy departments of the bureau, and be collected through the bidding industry.

6) The long-term lease land and permanent land acquisition in this project shall be handled by the bidder and shall bear the relevant prices.The bidder shall handle the transfer and land acquisition process of this project in accordance with the relevant national regulations, and shall bear the price of the joint bid generated during the process. The bidder is responsible for the payment of the construction land (except the land acquisition red line, exceeding the planning standards), and is responsible for the relevant temporary land use process, and the bidder will provide assistance.

7) Jointly recruit the person to complete the tasks of quality supervision, online inspection, lightning protection inspection, fire protection inspection, file inspection, environmental protection inspection, and health safety inspection.

8) The bidder is responsible for completing the station function test. The bidder has the right to entrust other units with corresponding qualifications to conduct third-party functional inspections. The bidder is Sugar baby should share the same, and the common price is included in the contract price. If the functional test (or third-party functional test) proves that the station function does not meet the design functional indicators, the bidder is responsible for eliminating the defect until the request is met TC: